Critical Success Factors of Change Management in Software Projects | Vestnik Tomskogo gosudarstvennogo universiteta. Ekonomika – Tomsk State University Journal of Economics. 2021. № 55. DOI: 10.17223/19988648/55/11

Critical Success Factors of Change Management in Software Projects

Markets, technologies, and the business environment change in shorter cycles, and organizations need to transform. Often transformations in organizations include new software systems. ITIL defines change as the process of moving from one defined state to another. The introduction of software systems within change projects fail in a large number of cases. What are the success factors for a thriving change project? A systematic literature review leads to 22 critical success factors of change management. Sixty-one articles were read. Ten of them are relevant for this contribution. Twenty-two critical success factors for change management have been described. Analysis of critical success factors for change management is a crucial part of successful implementation of software systems in organizations since such factors are relevant for successful changes.

Download file
Counter downloads: 40

Keywords

change, change management, success factors, software, organization

Authors

NameOrganizationE-mail
Lubbecke Henninghenning.luebbecke@bev.bund.de
Всего: 1

References

Reintjes, D. (2019) Wirtschaftswoche. 27.01.2019. [Online] Available from: https://www.wiwo.de/erfolg/management/studie-warum-viele-mitarbeiter-den-wandel-im-unternehmen-nicht-mitmachen/23911224.html
Sarayreh, B.H., Khudair, H. & Barakat, E.A. (2013) Comparative study: The Kurt Lew-in of change management. International Journal of Computer and Information Technology. 2 (4). pp. 626-629.
Kostka, C. (2016) Change Management: Das Praxisbuch fur Fuhrungskrafte. Carl Hanser Verlag GmbH Co KG.
Botthof, H.-J. (2009) Change Management. [Online] Available from: https://publickation.msg.group/publikationsarchiv/fachartikel/256-changemanagement-den-permanenten-wandel-im-unternehmen-als-natuerliche-entwicklung-begreifen/filebesucht (Accessed: 12.12.2019).
Lewin, K. (1947) Frontiers in group dynamics: Concept, method and reality in social science; social equilibria and social change. Human Relations. 1. pp. 5-41.
Kotter, J.P. (1995) Leading change: Why transformation efforts fail. Harvard Business Review. 73 (2).
Burnes*, B. (2004) Kurt Lewin and complexity theories: back to the future? Journal of Change Management. 4 (4). pp. 309-325.
Kaminski, J. (2011) Theory applied to informatics-Lewin’s Change Theory. Canadian Journal of Nursing Informatics. 6 (1).
Digitaler Mittelstand. (n.d.) Change Management: 8 Phasen nach John P. Kotter. [Online] Available from: https://digitaler-mittelstand.de/business/ratgeber/change-manage-ment-8-phasen-nach-john-p-kotter-7090
Kitchenham, B. & Charters, S. (2007) Guidelines for performing systematic literature reviews in software engineering. Keele University.
Yeoh, W., & Popovic, A. (2016) Extending the understanding of critical success factors for implementing business intelligence systems. Journal of the Association for Information Science and Technology. 67 (1). pp. 134-147.
Netland, T.H. (2016) Critical success factors for implementing lean production: the effect of contingencies. International Journal of Production Research. 54 (8). pp. 2433-2448.
Uhl, A., & Gollenia, L. A. (eds) (2016) A handbook of business transformation management methodology. Routledge.
Alrasheedi, M., Capretz, L.F. & Raza, A. (2016). Management’s perspective on critical success factors affecting mobile learning in higher education institutions-An empirical study. Journal of Educational Computing Research. 54 (2). pp. 253-274.
Tabak, R. (2016) Critical success factors for spend analytics. Master’s thesis. Aalto University.
Parkes, A. (2016) A critical success factors model for business process implementation. Taylor’s Business Review. 6. pp. 15-37.
Tyagi, D., Soni, V. K., & Khare, V. K. (2016) Assessing the Critical Success Factors and Barriers for Six Sigma Implementation in Auto Component Indian SMEs. International Journal of Research in Mechanical Engineering. 4 (2). pp. 15-26.
Alshibly, H., Chiong, R. & Bao, Y. (2016) Investigating the critical success factors for implementing electronic document management systems in governments: evidence from Jordan. Information Systems Management. 33 (4). pp. 287-301.
Totla, K., Mandot, M., & Gaur, S. (2016) An insight of critical success factors for ERP model. International Journal of Emerging Research in Management & Technology. 5. pp. 90-92.
Altamony, H., Al-Salti, Z., Gharaibeh, A. & Elyas, T. (2016) The relationship between change management strategy and successful enterprise resource planning (ERP) implementations: A theoretical perspective. International Journal of Business Management and Economic Research. 7 (4). pp. 690-703.
Niazi, M., Wilson, D. & Zowghi, D. (2005) A maturity model for the implementation of software process improvement: an empirical study. Journal of Systems and Software. 74 (2). pp. 155-172.
Association of Change Management Professionals (ACMP). (2014) Standard of Change Management.
Ahmed, F. & Capretz, L.F. (2010) An organizational maturity model of software product line engineering. Software Quality Journal. 18 (2). pp. 195-225.
Cooke-Davies, T.J. & Arzymanow, A. (2003) The maturity of project management in different industries: An investigation into variations between project management models. International Journal of Project Management. 21 (6). pp. 471-478.
Cosic, R., Shanks, G. & Maynard, S. (2012) Towards a business analytics capability maturity model. ACIS 2012: Location, Location, Location: Proceedings of the 23rd Australasian Conference on Information Systems 2012. ACIS. pp. 1-11.
Corriss, L. (2010) Information security governance: Integrating security into the organizational culture. Proceedings of the 2010 Workshop on Governance of Technology, Information and Policies. ACM. pp. 35-41.
Muller, S.D., Krammergaard, P. & Mathiassen, L. (2009) Managing cultural variation in software process improvement: A comparison of methods for subculture assessment. IEEE Transactions on Engineering Management. 56 (4). pp. 584-599.
Urban, W. (2015) The lean management maturity self-assessment tool based on organizational culture diagnosis. Procedia - Social and Behavioural Sciences. 213. pp. 728733.
Kwak, Y.H. & Ibbs, C.W. (2002) Project management process maturity (PM) 2 model. Journal of management in engineering. 18 (3). pp. 150-155.
Curtis, B., Hefley, B. & Miller, S. (2009). People capability maturity model (PCMM) version 2.0 (No. CMU/SEI-2009-TR-003). CARNEGIE-MELLON UNIV PITTSBURGH PA SOFTWARE ENGINEERING INST.
Sithole, K., Gore, S.N. & Gondo, K. (2017) Critical Success Factors for Public-Private Partnerships in Higher Education: A Review of Literature. International Journal of Educational Administration and Policy Studies. 12 (2). pp. 133-146.
Jeffery, M. & Leliveld, I. (2004) Best practices in IT portfolio management. MIT Sloan Management Review. 45 (3). p. 41.
Ginsberg, M.P. & Quinn, L.H. (1995) Process tailoring and the the software capability maturity model. Pittsburgh: Carnegie Mellon University.
Stelzer, D. & Mellis, W. (1998) Success factors of organizational change in software process improvement. Software Process: Improvement and Practice. 4 (4). pp. 227-250.
Yeo, K. T., & Ren, Y. (2009) Risk management capability maturity model for complex product systems (CoPS) projects. Systems Engineering. 12 (4). pp. 275-294.
Spoelstra, W., Iacob, M. & van Sinderen, M. (2011) Software reuse in agile development organizations: a conceptual management tool. Proceedings of the 2011 ACM Symposium on Applied Computing. ACM. pp. 315-322.
Morris, A., Wilkinson, S.J., Algeo, C. & Candusso, D. (2016) Measuring project success in local government. ANZAM.
Litzcke, S.M. & Nolte, R. (Hrsg.) (2008) Change Management - Theorie und Praxis. Bruhl: Fachhochschule des Bundes fur offentliche Verwaltung.
Iribarren, M., Concha, G., Valdes, G., Solar, M., Villarroel, M. T., Gutierrez, P. & Vasquez, A. (2008) Capability maturity framework for eGovernment: A multi-dimensional model and assessing tool. International Conference on Electronic Government. Springer. pp. 136-147.
Haris, F. (2010) IT Infrastructure Maturity Model (ITIMM: A Roadmap to Agile IT Infrastructure. Master’s thesis. University of Twente.
Areemy, Z., Chang, V., Walters, R. & Wills, G. (2016) Critical success factors (CSFs) for information technology governance (ITG). International Journal of Information Management. 36 (6). pp. 907-916.
Institute of Electrical and Electronic Engineers. (1991) IEEE Std 610: Standard Computer Dictionary. Institute of Electrical and Electronic Engineers, USA.
Paulk, M.C., Weber, C.V., Garcia, S.M., Chrissis, M.B.C. & Bush, M. (2018) Key practices of the capability maturity model version 1.1. Carnegie Mellon University. Report. DOI: 10.1184/R1/6575027.v1
Sun, M., Vidalakis, C., & Oza, T. (2009) A change management maturity model for construction projects. Proceedings 25th Annual ARCOM Conference, of Association of researchers in construction management. ARCOM. pp. 803-812.
Van Veenendaal, E., & Wells, B. (2012) Test Maturity Model integration TMMi. Uitgeverij Tutein Nolthenius.
Johansson, E. (2002) Quality Improvement in Software Platform Development. Lic. thesis.
Agapie, E., Avrahami, D. & Marlow, J. (2016, May). Staying the course: system-driven lapse management for supporting behaviour change. Proceedings of the 2016 CHI Conference on Human Factors in Computing Systems. ACM. pp. 1072-1083.
Miklosik, A. (2015) Improving project management performance through capability maturity measurement. Procedia Economics and Finance. 30. pp. 522-530.
Gunjal, B. (2019) Knowledge management: why do we need it for corporates. Malaysian Journal of Library & Information Science. 10 (2).
Qu, Y. et al. (2019) An integrated framework of enterprise information systems in smart manufacturing system via business process reengineering. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture. 233 (11). pp. 2210-2224.
Rowlinson, S. & Cheung, Y.K.F. (2008) Stakeholder management through empowerment: modelling project success. Construction Management and Economics. 26 (6). pp. 611-623.
Sarma, A., Van der Hoek, A. & Redmiles, D. (2010) The coordination pyramid: A perspective on the state of the art in coordination technology. Computer Science and Engineering, Department of CSE Technical Reports, University of Nebraska - Lincoln.
 Critical Success Factors of Change Management in Software Projects | Vestnik Tomskogo gosudarstvennogo universiteta. Ekonomika – Tomsk State University Journal of Economics. 2021. № 55. DOI: 10.17223/19988648/55/11

Critical Success Factors of Change Management in Software Projects | Vestnik Tomskogo gosudarstvennogo universiteta. Ekonomika – Tomsk State University Journal of Economics. 2021. № 55. DOI: 10.17223/19988648/55/11

Download full-text version
Counter downloads: 287